EXHIBIT ENGINEERS · ZIGONG, CHINA
Voice activated fountain installation — actual physical exhibit reference photograph

Water Play

Voice activated fountain installation

An outdoor speaking post and fountain basin connect visitor sound with a visible water response, creating a shared cause-and-effect activity within a public discovery setting.

▶ Watch the film
22 sec · Real operating video

THE PRODUCT IN MOTION

See it work.

See the actual physical reference and its demonstrated interaction. Use the voice input as directed by the installed instructions.

Video & text guide

THE ACTIVITY & MECHANISM

Connect visitor sound with a water response

A speaking post stands beside a water feature so a visitor can address the input and watch the fountain response. The installation connects a sound-related input with a distant visible output. The exact trigger, response limits and whether the system responds to volume or another sound feature require confirmation.

  1. 01

    Approach

    Stand at the designated speaking post beside the basin.

  2. 02

    Speak

    Use the voice input as directed by the installed instructions.

  3. 03

    Compare

    Observe the fountain response and compare repeated attempts without assuming a calibrated sound-level reading.

REFERENCE & PROJECT SCOPE

Reference specifications.

Use the reference dimensions and operating information to plan the exhibit. The agreed project drawings define the supplied configuration, installation interfaces and service access.

Approx. L × W × H
6,000 × 2,500 × 1,600 mm
Exhibit theme
Water Play
Visitor activity
Approach · Speak · Compare
Reference operation
A visitor uses the microphone beside the landscape pool while a vertical water jet rises and falls. The footage does not establish a calibrated sound-level-to-height relationship.
Power & supply
Powered versions can be configured for 110/220 V AC, 50/60 Hz. Confirm the site connection and fixing schedule for this configuration before installation.
Reference construction
Common material options include Q235 steel, stainless steel, aluminium alloy, PVC, acrylic, engineering plastics. The combination is selected for each configuration.
Configuration options
Appearance, interpretation language, controls and installation arrangement by project agreement
Daily operating schedule
8 hours per day
Scheduled maintenance
Every 30 days
Factory dispatch lead time
30–120 calendar days after design approval and receipt of the deposit. Transit time is additional.
Minimum custom order
One exhibit

Approximate planning estimate: 6000 × 2500 × 1600 mm (L × W × H). One voice post and its associated three-ball fountain basin, static hardware only; wider landscaping and maximum jet height excluded.

Reference configuration notes
Speaking post
A yellow visitor input post stands at the basin edge.
Outdoor basin
The fountain sits in a dark basin integrated into an outdoor landscaped setting.
Shared response
The footage shows a participant using the post while watching the water feature.
Customisation, installation & support
01Overall layout
Confirm complete L × W × H, including supports and base, together with visitor approach and service access.
02Selected configuration
Coordinate the basin, speaking post, plant access and public viewing edge. Confirm the actual sound-to-fountain control mapping for the selected version.
03Interpretation and language
Review the learning task, control labels and final English content against the selected physical version.
04Operational plan
Inspect the input post, water outlets, accessible fixings and control equipment. Agree water treatment, drainage and seasonal operation with the site team.
See the design-to-delivery process

BEFORE AN ENQUIRY

Questions & support.

24 months of complimentary spare-parts support, remote technical guidance and long-term after-sales support. Exhibit Engineers pays the shipping cost of complimentary spare parts during the 24-month support period.

Explore the support
Delivery, installation & after-sales terms
Payment
A 50% deposit is payable after the contract is signed. The remaining balance is paid after acceptance and before dispatch, so full payment is received before dispatch. Payment methods are agreed in the contract.
Packaging & transport
Metal shipping cases or multilayer wood-panel shipping cases. Transport arrangements and costs are agreed to suit the project.
Materials & painted finish
Common material options include Q235 steel, stainless steel, aluminium alloy, PVC, acrylic, engineering plastics. The combination is selected for each configuration. Marine anti-corrosion paint with a piano-gloss automotive paint finish. Applied to painted parts.
Typical power · powered versions
Standard products: 100–500 W; oversized installations: 1,000–5,000 W. Typical ranges for powered versions. Confirm the selected model and final connected load.
Product maintenance
Suggested inspection points include the microphone, jet nozzle, pump intake, water level, exposed cables and the wet visitor area. Confirm filtration and water-treatment procedures for the installed pool.
Installation & training
Complimentary training is available on site or remotely, according to project needs. If installation or on-site after-sales service is not included in the product price, the customer pays the actual travel expenses incurred, unless the contract provides otherwise.
Factory acceptance & handover
Mid-production and pre-dispatch checks are provided. Factory acceptance can take place in person at the factory or through acceptance videos. Installation and operating videos, written installation and operating instructions, drawings and a spare-parts list are provided.
Complimentary parts
24 months of complimentary spare-parts support, starting when the exhibit is handed over for use. Covers faults not caused by the user. User-caused or deliberate damage is excluded. Exhibit Engineers pays the shipping cost of complimentary spare parts during the 24-month support period.
Warranty & repair labour
The whole-exhibit warranty period and repair labour scope and charges are agreed in the contract.
Can we discuss a prototype or sample for a custom version?

Yes. Prototype testing and sample fabrication are available for custom projects. Discuss which functions or features you need to review for your version. The scope, cost and schedule are agreed for the project.

How prototype testing & samples work
Does a louder voice directly push the water upward?

Sound carries variations in air pressure. An electronic sensing and control system can translate a sound-related input into a separate output; this is a control-system analogy rather than sound directly lifting the water.

What do the images and videos show?

The gallery labels photographs, video frames, renderings and the dimension drawing. Physical footage is identified separately.

FROM CONCEPT TO TURNKEY DELIVERY

Start with a reference. Shape your version.

Share the exhibit name, intended users and a plan or description of your setting. We can work through the experience and practical scope.

START WITH YOUR IDEA

Tell us about your project.

Start with what you have: an idea, a sketch, a reference video or a procurement brief.

Review your message before opening WhatsApp. You can attach drawings or reference videos there.

SAVE YOUR PROJECT REFERENCES

Your selected exhibits.

1 · Select2 · Project3 · Verify & download

Save the exhibits you like, then choose up to 20 products for one complimentary PDF. Your saved list stays in this browser.

Start with an exhibit you like.

Choose “Save” on a product card or product page. Return here to prepare your collection.

Browse products ↗
0 / 20 selected

Need more information?

WhatsApp +86 13881436360 ↗[email protected]